  • 09/17/2015 FERC response reponds again on the water quality monitoring report sent by Boyce Hydro on Aug. 20, 2015 FERC.Responce.09.17.2015

August –

July –

June –

April –

  • 03/20/2015 Letter from Boyce Hydro Power LLC. to FERC on 2014 Bald Eagle Reporting for all 4 lakes. 2014 Bald Eagle Report

March –

2014

February –

2014
June –

May –

Apr –

  • 04/04/2014 Letter to FERC from Boyce with the 2013 erosion reports for all four dams. This is a very large file and will take awhile to download. 2014.Erosion.reports

Mar –

  • 03/18/2014 Letter from FERC requesting Boyce Hydro Power, LLC to provide additional information w/in 30 days regarding the minimum flow non-compliance at the Sanford Project. Allegation of Minimum Flow Non-Compliance.03.2014
  • 03/12/2014 Boyce Hydro has notified FERC and the Michigan DNR that due to the ice build up on Sanford Lake they are postponing the normal spring discharge requirements as outlined in their license. They will continue in winter mode until the ice begins to disappear and river flow increases.
    Here is the complete letter to FERC: Spring.Flow.Release.03.2014

Feb –

Jan –

  • 01/28/2014 Letter reminding Boyce Hydro Power, LLC of their license obligation to gather recreation use data for a 12-month period beginning no later than 3/15/14. Recreation.Data.01.28.2014

2013
Dec –

    • 12/11/2013 Boyce Hydro Power LLC submits a revised memo dated 10/27/09 concerning the status of the left embankment drain at the Sanford Project Left.Embankment.Drain.12.11.2013

Nov –

Oct –

Sept –

Aug –

July –

May –

Apr –

  • 4/23/2013 – FERC reponds to Boyce’s previous letter on water quality and monitoring. Boyce has 30 days to respond as FERC has concluded they violated the requirements of Article 407 of their Sanford license and article 402 of the Edenville, Secord, and Smallwood projects. 2012 Water Quality Monitoring Report.Responce
  • 4/23/2013 – FERC issues a request for validation from Boyce Hydro that downstream gages to measure flow, were installed and calibrated to satisfy compliance with their license. This has been a long standing issue predating Boyce’s ownership but is an outstanding obligation for Boyce to correct.downstream streamflow gaging.04.23.2013

Feb –

  • 3/13/2013 – FERC accepts Boyce’s submission on the 2012 Eurasian Water Milfoil and Purple Loosestrife Survey Report. Acceptance.2013
  • 2/14/2013 – Boyce responds on the ten recommendations for the Sanford dam. 2012.CSIR.Sanford
  • 2/13/2013 – Telephone conference between Boyce and FERC on Water quality monitoring. Water quality monitoring and schedule
  • 2/8/2013 – FERC issues a letter to Michigan State Historic Preservation Officer for comments on Boyce’s Non-Capacity Amendment of License for the Sanford Project under P-2785. Michigan State Housing Development Authority
  • 2/5/202 – DNR files motion to intervene and comments on Boyce’s Non-Capacity Amendment of License for the Sanford Project under P-2785. Mi.DNR.Intervention
  • 2/5/2013 – DNR submits “Supplemental/Additional Information” on their original letter of 9/20/2012 concerning site issues. Supplemental-Additional Information.DNR

Jan –

  • Memo dated 1/10/13 re the teleconference record regarding Boyce’s Application for Non-Capacity Amendment of License for the Sanford Project under P-2785. Telephone Conversation.01.10.2013
  • Report on 2012 Survey of Eurasian Water Milfoil and Purple Loosestrife Report Note: This is a large document, download time will be slow!
  • Formal Notice from FERC on Boyce’s application to replace one of the turbines at the Sanford Lake powerhouse with a new unit. Notice of Application
  • Letter from Boyce to FERC responding to both the Michigan DNR and US Fish and Wildlife comments about Boyce’s desire to replace one of the Sanford turbines with a new, more efficient turbine that can generate power at low flow rates.Supplemental.Comments
  • Letter granting FERC an extension of time until Feb. 1, 2013 to file the survey reports for Eurasian watermilfoil and purple loosestrife at the Sanford Project No. 2785, Edenville Project No. 10808, Secord Project No. 10809, and Smallwood Project No. 10810.Letter.Granting.Extension

2012

Dec –

  • Letter informing Boyce Hydro Power, LLC that its 8/20/12 filing regarding a variance for the winter drawdown under Article 411 of the license for the Sanford Project will not be deemed a violation of its license under P-2785.Variance for the winter drawdown
  • Supplemental Information of Boyce Hydro Power, LLC under P-2785, et. al.. Request for extension of filing Eurasian Water MIlfoil and Purple Loosestrife Survey until Feb 1 2013, due to unanticipated delays in mapping completion.

Nov –

Oct –

Sep –

  • Boyce Hydro Power, LLC submits a copy of the letter received from MDNR indicating their concurrence & requesting FERC review re the Winter Drawdown for the Sanford Project. The new date if approved would be Dec.1 versus Dec. 15th.
    DNR Response
  • Request of Michigan Department of Natural Resources for enforcement action regarding compliance for public access and completion of recreational facilities at the Boyce Hydro projects, Tittabawassee River, Michigan under P-10810-000, et. al.. Request of Michigan Department of Natural Resources for enforcement action
  • Michigan Department of Natural Resources requests the Commission reject the application for a non-power license amendment for the Sanford Project on the Tittibawassee River, Michigan under P-2785-000. Reject the application for a non-power license
  • Non-Capacity Amendment to Application of Boyce Hydropower, LLC under P-278 Non-Capacity.Amendment
  • Boyce Hydro Power, LLC submits their 2012 Water Quality Report for the Sanford, Edenville, Smallwood, and Secord Projects, pursuant to Article 407 et al under P-2785 2012 Water Quality Report

Aug –

  • Boyce has asked FERC to allow them to lower the lake ahead of the normal winter drawdown schedule. The new date if approved would be Dec.1 versus Dec. 15th.
    winter drawdown.2012

Jun –

Apr –

Mar –

  • In response to the Feb FERC letter on the 2010 Survey Report for the Eurasian Watermilfoil and Purple Loosestrife within 30 day, Boyce is requesting an extension.
    Request for extension of time

Feb –

Jan –

  • Boyce responds to an earlier FERC request for an update on the Gladwin properties.Gladwin.01.19.2012

2011

Oct –

July –

  • Boyce Hydro Power, LLC submits 3 sets of pictures showing the installation of the three drains inserted through the concrete bag walls at the Sanford Embankment re the Sanford Project under P-2785. Project Operations Compliance Report.7.18.2011

May –

April –

March –